Machine models, tube ranges and results below are typical of the configurations we ship. When you have real site photos and project data, swap these cards and keep the same layout.
Machine de découpe de tubes laser 3D à grande vitesse
Foshan, Guangdong
Compatible with four metal types; follow-up cutting with standard high-precision height controller
Machine de scie circulaire en métal à grande vitesse
Foshan, Guangdong
Complete electrical, hydraulic, lubrication, cooling and chip-cleaning systems for easy automation integration
Machine de découpe de tubes entièrement automatique
Foshan, Guangdong
Only half the power of similar machines; precision guide rails and servo feeding, accuracy ≤0.05mm
±0.05
mm repeat length
3 min
typical changeover
240
mm max tube OD
24 h
service response
How an installation actually runs
Commissioning is finished only when the first production batch passes inspection on the customer’s own tube — not when the machine powers on.
STEP 01
Site survey and power / gas check
STEP 02
Machine levelling and chuck alignment
STEP 03
Test cut on the customer’s tube
STEP 04
Operator training and handover
Demande de produit
Ce site Web utilise des cookies et demande vos données personnelles pour améliorer votre expérience de navigation.