Machine models, tube ranges and results below are typical of the configurations we ship. When you have real site photos and project data, swap these cards and keep the same layout.
Высокоскоростной станок для лазерной резки труб 3D
Foshan, Guangdong
Compatible with four metal types; follow-up cutting with standard high-precision height controller
Высокоскоростная циркулярная пила по металлу
Foshan, Guangdong
Complete electrical, hydraulic, lubrication, cooling and chip-cleaning systems for easy automation integration
Полностью автоматический станок для резки труб
Foshan, Guangdong
Only half the power of similar machines; precision guide rails and servo feeding, accuracy ≤0.05mm
±0.05
mm repeat length
3 min
typical changeover
240
mm max tube OD
24 h
service response
How an installation actually runs
Commissioning is finished only when the first production batch passes inspection on the customer’s own tube — not when the machine powers on.
STEP 01
Site survey and power / gas check
STEP 02
Machine levelling and chuck alignment
STEP 03
Test cut on the customer’s tube
STEP 04
Operator training and handover