Pre-sales and after-sales, kept apart
Most suppliers blend both into one list. They are two different promises — one is made before your money moves, the other after the machine lands.
Sales consultation
Talk to one sales engineer, not a call centre. Send tube size, wall thickness and cut length; the quote comes back with a machine configuration, not just a price.
Reply in 24 hProcurement plan evaluation
We check the part drawing, batch size and changeover frequency before recommending a model — so the machine fits the work, not the other way round.
Drawing review includedSample cut before you commit
One tube plus one drawing. We cut it on the configured machine and return the part with a length and squareness report — decide on a real cut, not on a video.
3–5 working daysInstallation & commissioning
Levelling, chuck alignment, gas and power check, then a test cut on your own tube. Handover happens after the first batch passes inspection.
On siteOperator training
Two days on your actual cut list: loading, nesting, focus and nozzle changes, plus the daily checks that prevent most stoppages.
2 days · 2–4 operatorsSpare parts & maintenance
Nozzles, protective lenses, chuck jaws and drive parts held in stock. Maintenance intervals are scheduled from cut hours, not from a calendar.
48 h dispatchWarranty & lifetime support
12 months on the machine, lifetime remote diagnosis on the controller. We do not advertise a "lifetime warranty" — we say what we can actually honour.
12 months · then remoteDocuments, ready to send
Files are sent on request — we do not gate them behind a form. Tell us which one and it arrives by email or WhatsApp within one working day.
